Table 7 Land cover Distribution: |
1,262 acres (24%) Disturbed Land (Graded/Grubbed) 305 acres (25%) Impervious Roads 72 acres (1%) Impervious Buildings 2,225 acres (42%) Open Space/Pasture/Meadow 1352 acres (26%) Forest Patches 25 acres (0.5%) Water x |
Stormwater Management in: cubic feet................................. 1,812,462 (one time value) U.S. dollars..............................$3,624,923 Annual Air Pollution Removal Value in: pounds....................................86,857 U.S. dollars.............................$180,600
Total Carbon Stored: tons..........................................554
Carbon Sequestered Annually: tons.........................................4.31
Total Economic Benefit: U.S. dollars.............................$3,805,524
|
 a |
| Scroll down for more detailed information about the above data . |
|
A |
|
Total Area:
|
2.01 sq. miles
|
|
|
a
|
520.94 sq. km (hectares)
|
|
|
a
|
1,287.22 acres
|
|
|
|
|
|
|
Landcover Composition:
|
04.72% of EAST BANK
|
60.79 acres
|
- Water Area (100)
|
a
|
12.04% of EAST BANK
|
154.93 acres
|
- Forest Patches
|
aaa
|
30.97% of EAST BANK
|
398.65 acres
|
- Grass w/ Scattered Shrubs
|
a
|
25.28% of EAST BANK
|
325.39 acres
|
- Disturbed land (87)
|
a
|
06.08% of EAST BANK
|
78.26 acres
|
- Impervious Surfaces: Buildings
|
a
|
20.91% of EAST BANK
|
269.15 acres
|
- Impervious Surfaces: Paved Streets
|
Definitions: - Forest Patches (Wooded or forested with non-turf understory): Woods grazed but not burned, some forest litter (Fair Hydrologic Condition).
- Grass/Scattered Trees (Lawns, parks, golf courses, cemeteries, etc.): Grass cover < 50% (Poor Hydrologic Condition).
- Disturbed land - Graded, grubbed, minimal vegetation.
- Impervious Surfaces: Buildings, pavilions and other man-made structures, paved streets, open ditches.
- Sequestration: The rate at which a tree adds carbon to its biomass.
- Carbon storage: The amount of carbon stored in tree biomass.
|
|
|
|
|
Ecological Services:
|
Carbon Removal Benefits:
|
|
j
|
a
|
- Age Distribution:
|
Average or Unknown
|
j
|
a
|
- Storage Capacity (tons):
|
553.86
|
j |
a
|
- Sequestration Rate (tons/year):
|
4.31
|
j |
a
|
|
|
|
a
|
Air Pollution Removal Benefits:
|
|
|
a
|
- Air-Quality Reference City:
|
Seattle
|
|
a
|
- Contaminant:
|
Lbs/Year:
|
Dollar Value:
|
a
|
- - O3 (Ozone)
|
31,638.29
|
$ 97,115.91
|
a
|
- - SO2 (Sulfur Dioxide)
|
13,643.85
|
$ 10,258.63
|
a
|
- - NO2 (Nitrogen dioxide)
|
0
|
$ 0.00
|
a
|
- - PM10 (particulates <10 microns)
|
34,161.12
|
$ 69,995.54
|
a
|
- - CO (Carbon monoxide)
|
7,414.02
|
$ 3,230.76
|
a
|
Totals:
|
86,857.28
|
$ 180,600.85
|
a
|
a
|
a
|
a
|
Stormwater Runoff Control Benefits :
|
- Avg. 2-yr, 24-hour Precipitation (in.):
|
4.25
|
|
s
|
- Site Avg. Slope (%):
|
3.59
|
|
s
|
- Rainfall Region:
|
IA
|
|
s
|
- Hydrologic Soil Group:
|
C
|
|
s
|
ss
|
Current Conditions
|
Modeled w/out trees
|
s
|
- Curve Number:
|
87
|
88
|
s
|
- Runoff Depth (in):
|
2.87
|
2.96
|
s
|
- Time of Concentration (hrs):
|
1.96
|
1.89
|
s
|
- Peak Flow (cfs):
|
488.71
|
512.43
|
s
|
- Runoff Volume (cu. ft.):
|
13,395,659.23
|
13,838,936.34
|
s
|
- Storage required to mitigate the change in peak flow (cu. ft.):
|
1,812,461.61
|
|
Total Economic Benefit of Trees in Salem UGB
|
- Construction Cost (@ $2.00/ cu ft.):
|
$3,624,923.22
|
|
|