The public review draft of the Plan is listed in sections for easy download in pdf format.
 |
Executive Summary |
 |
Part I |
 |
Part II |
 |
Figure 1, Permit Area Map |
 |
Figure 2, Land Use Map |
 |
Figure 3, Monitoring Location Map |
 |
Appendix A, NPDES MS4 Permit (March 2004) |
 |
Appendix B, BMP Responsibility Matrix |
 |
Appendix C, Street Sweeping Screenings Analytical Test Results |
 |
Appendix D, Public Education and Participation |
 |
Appendix E, Surface Water Quality Investigations Summary |
 |
Appendix F, BMP Effectiveness Workgroup Interim Report |
 |
Appendix G, Salem Urban Stream Sampling Data |
 |
Appendix H, Willamette River Stations Data |
 |
Appendix I, Outfall Sampling Data |
 |
Appendix J, Erosion Control Inspections and Violations |
 |
Appendix K, Public Input Materials for Second Annual Report |
 |
Appendix L, Public Comments on Second Annual Report |