Walker Road NE — 2023
This project installed five speed bumps on Walker Road NE between Carolina Avenue NE and Sunnyview Road NE.
Stortz Avenue NE — 2023
This project installed four speed bumps on Stortz Avenue NE between Portland Road NE and Robert Avenue NE.
Tierra Drive NE and Weathers Street NE — 2024
This project installed four speed bumps on Tiera Drive NE between Market Street NE and Weathers Street NE. Additionally, the project installed two speed bumps on Weathers Street NE between Tierra Drive NE and Lancaster Drive NE.
Rogers Lane NW — 2024
This project installed four speed bumps on Rogers Lane NW between Wallace Road NW and Kurt Drive NW.
Pikes Pass – Soapstone Stop Sign Plan — 2024
This project installed ten stop signs in the area generally bounded by Landau Street SE, Reed Lane SE, Blue River Drive SE and Mistymorning Avenue SE.
Arlene Avenue SE (West of Lone Oak Road SE) Stop Sign Plan — 2024
This project installed 12 stop signs in the area generally bounded by Hrubetz Road SE, Second Avenue SE, Lone Oak Road SE and Boone Road SE.
Arlene Avenue SE (East of Lone Oak Road SE) Stop Sign Plan — 2024
This project installed six stop signs in the area generally bounded by Lone Oak Road SE, Hrubetz Road SE, Boone Road SE and Jones Road SE.
Spruce Street NE Stop Sign Plan — 2024
This project installed six stop signs along Spruce Street NE between Brooks Avenue NE and Maple Avenue NE.
Englewood Area Stop Sign Plan — 2024
This project installed 12 stop signs in the area generally bounded by D Street NE, 23rd Street NE, 17th Street NE and Market Street NE.